Step by step installation process
- Define the installation location
- Install the fluidic line on the pipe and screw the sensor
- Connect the sensor to the transmitter
- Turn on the transmitter
- Verify measurement
- Document and share your installation in the Hummbox application journal
----------------------------
1. Define the installation location
2. Install the fluidic line on the pipe and screw the sensor
2.1 Pre requisites
2.2 Install the fluidic line and plug the sensor
The fluidic line can be positionned as a derivation of the principal pipe. In that case the user needs to make sure there is always a flow rate in that derivation.
The fluidic line can also be positionned at any end point where we can consider lost water.

Please connect the fluidic line where the input and output has been prepared at step 1.
Book of the installations :
Pre requisites for sensor startup
3. Connect the sensor to the transmitter
The probe need to be in water during 1h before to be turned on (or plugged if the transmitter is running). A lower time in water can damaged the probe.
4. Update settings into the App
5. Turn on the transmitter
Start up the Hummbox transmitter.
6. Verify the measurement
Enforce one measurement to verify measurement and network.
7. Document and share your installation in the Hummbox application journal
Post pictures of your installation into the journal.